
Matrix Renewables has announced the first deployment of Terabase’s Terafab V2 featuring autonomous rovers, at its Tormes Solar project in Navarro County, Texas. SOLV Energy is the EPC.
At Tormes, Terafab combines an on-site robotic assembly line, AI-driven automation and quality control, and autonomous and remote-controlled rovers that carry assembled PV tables to the point of installation. The deployment covers a portion of the project and serves as a proof of concept for 24/7 automated solar construction. Matrix will evaluate it on efficiency, construction speed, quality consistency, worker safety and cost competitiveness.
“Every other industry that had to scale learned to industrialize, and energy construction is next,” said Matt Campbell, CEO and Co-Founder of Terabase Energy.
Watch the video below or read Matrix Renewables’ full announcement →